-
  Publications
- ENTSOG > CMP -
 

In September 2009 the European Commission has officially invited ERGEG to develop a Framework Guideline on Capacity Allocation. ENTSOG is taking the steps towards the drafting of the Network Code on Capacity Allocation by fostering the dialogue between the Users, ERGEG and European Commission.

This website provides relevant information, documents (comprising position papers and consultation material) throughout all processes.

For any further question please contact :

Frank Roessler Heather Glass
frank.roessler@entsog.eu heather.glass@entsog.eu
T +32 (0)2 894 51 07 T +32 (0)2 894 51 15
T +32 (0)2 894 51 01 T +32 (0)2 894 51 01
 
-
   Congestion Management     
 
New - EC CMP Guideline Comitology proposal download this file
6   Oct   2011
1,45 Mb

 

  EC Madrid preseation on new CMP guideline download this file
27   Sep   2011
0,15 Mb
ENTSOG slides on restriction of renomination rights presented to 2nd EC workshop on CMP download this file
16   May   2011
0.46 Mb

 

ENTSOG slides presented to 1st EC workshop on CMP download this file
18   Apr   2011
0,28 Mb

 

ENTSOG response to EC consultation on CMP download this file
12   Apr   2011
0.34 Mb

 

ENTSOG CMP Comitology proposal
(CAP0071-10)
download this file
23   Nov   2010
0,53 Mb

 

EC CMP guideline proposal download this file
28   Sep   2010
0.02 Mb

 

ENTSOG Position paper on ERGEG’s CMP Comitology Guideline proposal
(CAP0005-10)
download this file
13   Apr   2010
0.48 Mb

 

   Capacity Allocation     
 
Legal opinion on proposed 'sunset clause' in ACER draft Framework Guideline
(LGT030-11)
download this file
26   May   2011
0.25 Mb

 

ENTSOG response to ACER draft Framework Guideline on CAM download this file
2   May   2011
0.30 Mb

 

ENTSOG Workshop on Auctions - Agenda
(CAP0066-10)
download this file
28   Oct   2010
0,26 Mb

 

  Notes of Auction Workshop download this file
28   Oct   2010
0.33 Mb
  Auction Workshop Slides download this file
28   Oct   2010
1,33 Mb
ENTSOG Position Paper on Existing Capacity
(CAP0053-10)
download this file
10   Aug   2010
0.33 Mb

 

ENTSOG Response to Pilot Framework Guideline on Capacity Allocation
(CAP001-10)
download this file
26   Feb   2010
0.25 Mb

 

ENTSOG Online Survey on CAM - printable version download this file
26   Oct   2009
0.25 Mb

 

  ENTSOG CAM Online Survey Analysis Report
(CAP010-10)
download this file
27   Apr   2010
0.50 Mb
Capacity Product Coordination - First Phase Report (GTE+)
(09GTE+107)
download this file
27   Mar   2009
0.47 Mb

 

  EFET CPC response download this file
18   Dec   2011
0.04 Mb
  BP CPC response download this file
18   Dec   2011
0.19 Mb
  ENI CPC response download this file
18   Dec   2011
0.04 Mb
  Eurogas CPC response download this file
18   Dec   2011
0.03 Mb
  StatolHydro CPC response download this file
18   Dec   2008
0.11 Mb
  ERGEG CPC response download this file
18   Dec   2008
0.05 Mb
  Centrica CPC response download this file
18   Dec   2008
0.03 Mb
  Capacity Product Coordination - Consultation Document
(08GTE+300)
download this file
28   Oct   2008
0.69 Mb
GTEplus Coordination of Capacity Products workshop download this file
29   Oct   2008
0.47 Mb

 

  Workshop invitation download this file
29   Oct   2008
0.35 Mb
   Workshops, meetings, presentations     
 
Notes of Meeting with EC, ACER and ERGEG
(CAP094-11)
download this file
21   Jan   2011
0.31 Mb

 

Notes of Meeting with EC and ERGEG
(CAP077-10)
download this file
9   Nov   2010
0.35 Mb

 

ENTSOG Slides on CAM Process in MF XVIII - Frank Roessler download this file
28   Sep   2010
0.56 Mb

 

ENTSOG Slides on EC CMP Proposal in MF XVIII - Frank Roessler download this file
28   Sep   2010
0.38 Mb

 

Notes of Meeting with European Commission
(CAP043-10)
download this file
3   Jun   2010
0.47 Mb

 

Notes of Meeting with ERGEG
(CAP039-10)
download this file
20   May   2010
0.33 Mb

 

Notes of Meeting with ERGEG
(CAP034-10)
download this file
28   Apr   2010
0.47 Mb

 

Notes of Meeting with ERGEG
(CAP026-10)
download this file
30   Mar   2010
0.42 Mb

 

Notes of Meeting with ERGEG
(CAP011-10)
download this file
2   Mar   2010
0.44 Mb

 

Notes of Meeting with ERGEG and EC on CAM & CMP download this file
3   Feb   2010
0.08 Mb

 

ENTSOG Slides on CAM at ERGEG CAM/CMP Workshop - Ralph Bahke download this file
2   Feb   2010
0.13 Mb

 

ENTSOG Slides on Online Survey results at ERGEG CAM/CMP Workshop - Thomas L'Eglise download this file
2   Feb   2010
0.49 Mb

 

ENTSOG Slides on CAM progress at Madrid Forum XVII: "Initial response Pilot Framework Guideline Capacity Allocation" - Frank Roessler download this file
14   Jan   2010
0.13 Mb

 

Notes of Meeting with ERGEG on Draft CAM FG download this file
9   Dec   2009
0.11 Mb